Obviously these aren't properly connected or anything, just leaning up against the side of the framework.

Need to pack in behind some pieces as the treated pine I used for the stand was pretty average quality (some pieces had slight shaves on them and stuff), and all it takes is a few mm's and things aren't flush. Luckily got just the stuff for the job, and should be all too easy (famous last words).
The top of the stand is removable, and currently not screwed in so we could get it inside. It screws from the inside of the top, so that I will be able to get it inside and out even whilst the cladding is on! I have no doors or windows to fit a 1m cube through, so top had to be made this way. Then it can be turned sideways and pivoted through the door as it has a U shape without the top on, i'll try take some photos later.
The cladding is 16mm MDF or something from memory, will be all painted so not too worried about water issues arising. Planning to use that marine paint, it's not such a pain as 2 pac can be, and still seems to give great results. Going to be all black I have decided after chatting on IRC!
edit: And forgot to mention, those giant holes, that's where the doors are gonna be. They will be one big single door on three sides, going to need a few hinges for them I suspect! They will be flush with the cladding.